LOTS has happened to that
previously mauve/white bathroom in 4 days! Demo, little glitch, fixed glitch (thank you awesome plumber, Bill!), shower drain moved, sink drains moved, 4 cans dropped in the ceiling, new fan installed, 3 boxes placed for sconces, 1 outlet moved, 2 outlets created, cable and outlet installed and 2 switches moved. Plumbing should be pretty well done by tomorrow so framing and drywall can take place next week. Big high-five to Jon for coordinating all the efforts. He's so great to work with and has brought in equally fabulous folks to get the job done.
But I can't WAIT for the tiling to begin (Jon's specialty).
It's difficult to get a good shot of this kind of stuff on the internet, but check it out...
Countertop!
Cherry cabinet: Style - Charlottesville, Stain - Java

It's hard to tell, but I
think this "noce polished" is the tile we're using for the shower walls, tub deck and tub backsplash in a 12"x24" tile. Super pretty! This picture certainly doesn't do it justice, so you'll have to come over and see it for yourself. :)
I'm pooped from bossing people around all day.
Peace, out.
AK